![0x0-NEVADA_DJI_0596-1](https://i0.wp.com/driveteslacanada.ca/wp-content/uploads/2022/07/0x0-NEVADA_DJI_0596-1-scaled.jpg?resize=998%2C665&ssl=1)
Tesla reportedly set to begin Giga Nevada expansion
Tesla opened Giga Nevada in 2016, but only built out about 30% of what was proposed in the original plans. After years of prioritizing the battery cell production ramp inside the facility, Tesla is reportedly […]