PG&E commissions Moss Landing Elkhorn BESS with 256 Tesla Megapacks
Pacific Gas and Electric Company (PG&E) held a ceremonial ribbon-cutting ceremony today for the commissioning of its 182.5-megawatt (MW) Tesla Megapack battery energy storage system (BESS). Referred to as the Elkhorn Battery, the facility is … Continue reading PG&E commissions Moss Landing Elkhorn BESS with 256 Tesla Megapacks
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed